Plan every order. Build on time. Know what every batch cost.

Droot ERP runs discrete manufacturing on the same records as your books: S&OP demand plans, nightly MRP for each plant with pegging and exceptions, bills of materials and routings, cost estimates and standard costs, work orders with operation confirmations, job work, quality inspections at every gate, and conversion cost posted to work in progress as you produce.

If this sounds familiar

Most factories run on spreadsheets around the ERP. Yours won't.

Planning in Excel

Shortages are found on the shop floor because the plan lives in a spreadsheet that nobody else can see.

Costs found at month-end

What a batch really cost is reconstructed weeks later, long after the price was quoted.

Quality on paper

Inspection results sit in registers, so a rejected lot can still be issued to production.

Try the MRP planner

Change the demand. Watch the plan rebuild.

This is how an MRP run in Droot ERP nets a pump order against stock and open purchase orders, and what it proposes to buy.

Plan an order of Pump Assembly PX-40

Change the quantity or the due date. MRP nets every component against stock and open purchase orders.

Components short6 of 6
To buy₹22.67 L
Already late0

Shortage list

What the MRP run proposes, with the date each order must go out.

ComponentNeededStock + on orderShortOrder byProposal
Pump Casing40020020024 OctPlanned purchase
Impeller40026014027 OctPlanned purchase
Motor 2 HP40024016020 OctPlanned purchase
Mechanical Seal Kit40018022029 OctPlanned purchase
Fastener Set4,8004,60020031 OctPlanned purchase
MS Coil 2mm (kg)1,4001,30010022 OctPlanned purchase

Sample bill of materials · plan date 8 Oct 2026

End to end

From demand to dispatch, in one system.

Each step creates the next document, so nothing is typed twice and every number traces back to its source.

  1. Demand plan

    Sales · Manufacturing

    In S&OP, the demand plan starts from a baseline, takes the sales team's input and agrees a consensus per item and period. It is checked against work-centre capacity, approved and released to MRP as the plant's forecasts.

    Creates Demand Plan · Forecasts
  2. MRP run

    Manufacturing

    MRP runs for each plant, nightly if you like. It takes sales orders and forecasts, explodes every bill of materials, nets against stock, open purchase orders and work in progress, and proposes planned orders pegged to the demand they cover. Exceptions flag what is late or should be expedited, deferred or cancelled.

    Creates Planned Orders · MRP Exceptions
  3. Buy and job work

    Procurement

    Planned purchases become requisitions with budget-checked approval. Planned subcontract orders become job work orders: components go out lot by lot in FIFO or FEFO order, and each order reconciles what was sent against output, scrap and the allowed process loss.

    Creates Requisition · Job Work Order
  4. Production

    Manufacturing · Inventory

    Work orders are released with their routing, components are reserved and issued, and operators confirm operations with machine time.

    Creates Work Order · Goods Issue · Confirmation
  5. Quality

    Quality

    Incoming, in-process and final inspections are raised automatically. Usage decisions release or reject the lot; failures raise a non-conformance report, and a vendor's fault an 8D corrective action request.

    Creates Inspection · Usage Decision · NCR · SCAR
  6. Costing and close

    Manufacturing · Manufacturing Accounting

    Cost estimates price a product for a lot size and release its standard cost. Conversion cost posts to work in progress as operations are confirmed; closing the order settles it to finished goods with the variance.

    Creates Standard Cost · Journal Entries · Cost Report
  7. Dispatch and invoice

    Sales · GST

    Finished goods are delivered and invoiced with GST and an e-invoice, and the order's margin is visible against its cost.

    Creates Delivery · Tax Invoice
Capabilities

Everything a plant needs, already connected to the books.

Planning

  • S&OP: baseline, sales input, consensus
  • Nightly MRP per plant
  • Pegging and MRP exceptions
  • Master schedule and capacity load

Engineering

  • Multi-level bills of materials
  • Routings and work centres with rates
  • Engineer-to-order project BOMs
  • Engineering changes and item lifecycle

Shop floor

  • Work orders released with routing
  • Component reservation and issue
  • Operation confirmations with machine time
  • Work orders by status per work centre

Quality

  • Inspection plans per item and stage
  • Usage decisions and non-conformance reports
  • 8D supplier corrective actions (SCAR)
  • Vendor quality scorecard

Subcontracting

  • Job work orders from MRP
  • Lots sent in FIFO or FEFO order
  • Process loss and component reconciliation
  • ITC-04 job work returns

Costing and traceability

  • Cost estimates and standard-cost release
  • Conversion cost posted to WIP
  • Variance when the order closes
  • Batch and serial traceability
For every seat at the table

What each leader in a manufacturing company sees.

See which orders make money and which are late.

Order book, on-time delivery and margin by product, plant and company, live, without waiting for the monthly MIS.

What they see first

On-time delivery, MTD94.2%
Gross margin, MTD23.8%
Orders at risk7
Plants on plan3 of 4
Sample figures
Questions

Frequently asked questions.

What kind of manufacturing does Droot ERP support?

Discrete manufacturing: assembled and machined products with multi-level bills of materials, routings, production versions, batches and serials. Engineer-to-order products get a bill of materials engineered for the project, and the work order is made from the project task. Recipe-based production with potency and co-products is not part of Droot ERP today.

Can we manage job work with our vendors?

Yes. Planned subcontract orders become job work orders that send components lot by lot in FIFO or FEFO order, track the stock lying with the job worker, and receive the processed lot back through inspection. Each order reconciles every component against an allowed process loss, and ITC-04 returns come from the same records.

How does costing work?

Cost estimates work out a product's cost for a lot size and release it as the standard cost. Materials post as they are issued, and conversion cost at work-centre rates posts to work in progress as operations are confirmed. Closing the work order settles it to finished goods and posts the variance.

We have several plants and companies. Is that a problem?

No. Each plant has its own work centres, stores and MRP run, nightly if you like, each company its own books and rules, and the group sees everything consolidated.

Can we start while still on Tally?

Yes. Many manufacturers run Droot ERP for planning, production and inventory while finance stays on Tally for a while, kept in sync by the Tally connector, then switch.