Surveys get lost
Roof details and photos live on a surveyor's phone, and the design team asks for them again.
Droot ERP's Solar EPC pack carries a project from the first enquiry to years of O&M: site surveys with photos, system design that sizes the plant and creates the BOQ, proposals with subsidy, payback and IRR, project execution, DISCOM and inspector approvals, handover by serial number, and O&M with performance ratio, guaranteed availability and monitoring alarms that open tickets.
Roof details and photos live on a surveyor's phone, and the design team asks for them again.
Every proposal is rebuilt in a spreadsheet, so sizing, BOQ and the price drift apart.
Net-metering and inspector approvals are chased by phone, and nobody knows which project is stuck where.
Size a system and see the generation, savings, subsidy, payback and IRR that a Droot ERP solar proposal shows.
The numbers a Droot ERP solar proposal shows your customer.
Residential · 3 kWp · Maharashtra & Karnataka
Indicative · 0.5% yearly degradation, 3% tariff escalation, O&M at 1%
The lead's site facts flow into the survey, the design, the BOQ, the project and the install base.
The lead records the site's facts once: load, consumption and bill, tariff, distribution company, roof or land, segment and irradiance zone.
Creates Lead · OpportunityThe surveyor records roof or land, orientation, tilt, structure, shading loss and meter details, with photos and a checklist. It prints as the Site Survey Report.
Creates Site Survey ReportModules, inverters, structure and balance of system are picked as items. The design gives DC kWp, AC kW, the DC:AC ratio and estimated generation.
Creates Approved DesignThe approved design creates the bill of quantities, the quotation carries it, and the proposal shows savings, subsidy, net cost, payback, IRR and payment milestones.
Creates BOQ · Quotation · Solar ProposalThe won order becomes a project: procurement against the BOQ, daily progress reports, joint measurements and subcontract work orders.
Creates Project · Purchase Orders · DPRsDISCOM net metering, CEIG inspection, fire NOC and other approvals are tracked with the authority, expected days and document checklist.
Creates Project ApprovalsHandover registers every inverter and module serial in the install base, with warranty. In O&M, meter readings give the performance ratio, monitoring alarms open tickets, downtime counts the energy and revenue lost, and guaranteed availability is worked out with liquidated damages. Preventive visits follow the maintenance plan.
Creates Handover · Install Base · O&M ContractPipeline in MWp and rupees, project margins, cash tied up in approvals and retention, and order intake by segment.
What they see first
Survey queue, designs awaiting approval, proposals sent and their follow-ups, with win rate by segment.
What they see first
Progress per project, material status against the BOQ, daily progress, and every approval with its age.
What they see first
Milestone billing, retention held, bank guarantees and EMDs, subsidy claims and project cost, posted as the work happens.
What they see first
Yes. Residential rooftop runs at high volume with quick surveys and subsidy-ready proposals; commercial, industrial and ground-mount projects get full project control, procurement, bank guarantees and milestone billing.
They are data, not code. Distribution companies, irradiance zones, subsidy slabs and approval types are lists your admins update when a new order or guideline comes out.
Yes. The Solar Proposal and Site Survey Report are documents in the no-code designer: your letterhead, sections and terms.
Handover registers each inverter and module serial with its warranty in the install base, as an asset tree under the plant. Alarms from monitoring portals open tickets on the right asset, downtime records the energy and revenue lost, meter readings give the performance ratio each month, and each O&M contract's guaranteed availability is worked out every period with its liquidated damages. Preventive visits, field work and AMC billing run from the same records.
Because the survey, design, BOQ, purchases, project cost and invoices then share one record, and margin per project stops being a month-end reconstruction.
A walkthrough built on your segments, DISCOMs and proposal format.